Build Your Oasis
Design Your Backyard Escape

At The Pool Captain, we don’t just build pools—we craft personalized outdoor experiences that reflect your lifestyle, elevate your property, and bring your vision to life. Whether you're dreaming of a sleek modern oasis, a family-friendly retreat, or a resort-style showpiece, our custom pool designs are tailored to fit your space, your taste, and your Florida lifestyle.
Building the Right Way
6" thick wall with #3 rebar 12" O.C.
Steps in shallow end
4′ long minimum swim out in deep end
Steel reinforced concrete footer for screen enclosure
Pool Coping: French curve concrete cantilever
Acrylic deck texture
Concrete decking with fiber mesh
soil under deck compacted to 95% density
Termite pre-treatment
Plumbing 2″ or greater minimum
3-way valves – NOT ball valves
Custom 3D design prior to signing a contract
On-site contractor supervision
10 yards of rock for dewatering
1 Year Builder Warranty


STAGE
1

LAYOUT / DIG
& STEEL
During the first stage of construction, our team will demo if needed, then layout the pool, dig the pool and finally steel it prior to first inspection.

STAGE
2

GUNITE
STRIP & GRADE
Once it has passed steel inspection, we will shoot the pool with shotcrete. Then within a few days following we will have your yard stripped and graded

STAGE
3

PLUMBING
After the yard has been graded, the next step is the plumbing. During this step we will install the pipes and pressurize the system for inspection. After it passes inspection, the equipment will be set.

STAGE
4

TILE & COPING
After the plumbing has been ran and passed inspection, and trenches are filled. We can begin the tile and coping phase.
What to Expect

STAGE
5

ELECTRIC &
BOND WIRE
Once the equipment has been set during the plumbing phase, the electrician can be scheduled to run the bond wire and install the pool panel.

STAGE
6

DECK INSTALLATION
Next comes the footer or deck installation., If you do not have a screen footer, we will move right into deck installation. There may be a deck inspection depending on your municipality.

STAGE
7

INTERIOR INSTALLATION
The pool finish is installed this week and is the last step before filling up your pool.

STAGE
8

FILL & FINAL INSPECTIONS
Immediately following the interior installation, we will fill your pool using your water and provide you with a water letter of credit. Shortly following you will receive a final inspection information sheet and warranty information sheet. We will schedule finals when you're ready
New Home for your New Pool?
We got you covered
We’re proud to collaborate with US Signature Homes—where custom craftsmanship meets exceptional care and lasting value.
Explore their work here.